Wastewater Treatment Plant

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

 

WWTP Sign 2 (2)

 

The First Broad River Wastewater Treatment plant is a modern six million gallon per day capacity facility with an activated sludge process.  With a current average flow of 3.36 million gallons per day, our competent staff of 14 employees is trained and certified in the wastewater treatment process to safeguard the effluent back into the First Broad River.

WWTP Lab

 

Plant Tours

Our staff at Shelby’s Wastewater Treatment Plant welcomes group or individual tours of our facility.  To arrange a plant tour, contact Steve Smith at 704-484-6850.

 

 

 

 

 

Other Important Information

 

Links

 

For more information, contact:

Jody Black, Plant Operations Superintendent/ORC

Steve Smith, Plant Supervisor/ORC

John Reuscher, Pretreatment Coordinator/Lab Supervisor/FOG

First Broad River Wastewater Treatment Facility

1940 S Lafayette Street, Shelby, NC 28152

(PO Box 207, Shelby, NC 28151-0207)

Phone: 704-484-6850 * Fax: 704-484-6872


Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer