About the first phase of the project (Phase 1A):
- Engineering is done by TGS Engineers and Destination By Design
- Phase IA constructed by Piedmont Utility Group
- Trail Theme is “ An Emphasis on Nature through An Urban Corridor”
- Trail will utilize a 13’ asphalt and concrete walkways
- Design Features
- Phase IA Extends from Sunset Cemetery to Marion St.
- Phase IA is approximately .65 Miles
- Phase IA will include a Gateway sculpture, Kiosk, perforated Metal Panels, Retaining Wall, Benches, and Lighting.
Click on the Google Maps icon below for directions.
Below are renderings of the section of the Carolina Harmony Trail adjacent to the Bobby Bell Pavilion, where the groundbreaking ceremony took place on November 16, 2022. The bottom rendering details some of the design elements planned for this section of the trail.
January 2023
Construction Grading
February 2023
Construction Grading
March-April 2023
Stormwater Installation & Grading
June-July 2023
Gravix Retaining Wall